Feature Operational Risk
The FDIC Just Published 25 Questions About Your Tech Stack. They're a Free Exam Scope.
The FDIC's November 27 IT examination RFI asks 25 questions that preview 2027 exam scope. Here's the evidence each one will demand, and how to answer in writing.
Table of Contents
TL;DR
- On November 27, 2026 the FDIC issued a request for information on its IT examination program, RIN 3064-ZA56, with 25 numbered questions (RFI).
- The questions are not fluff. Questions 10 through 14 name the exact artifacts examiners want for patching, asset inventory, end-of-life systems, ransomware readiness, and resilience testing. Build them now and the exam gets shorter.
- The FDIC’s new materiality standard (91 FR 56004) means process findings should thin out. The findings that survive will be the ones with a dollar or outage path attached.
- The one part you cannot fake is Question 19: the difference between a pilot and production. If you have no written line between the two, every experiment looks like an uncontrolled deployment.
The most useful exam-prep document the FDIC published this year is a comment request, and almost nobody will read it as one.
On November 27 the agency posted a request for information on its information technology examination program. Twenty-five numbered questions, RIN 3064-ZA56, comments due 45 days after Federal Register publication. The PDF runs 16 pages, and the substance sits in sections A through H.
Read it as a policy comment and you will write a paragraph about burden and forget it. Read it as a scope document and you get a preview of the 2027 InTREx conversation, six months early, in the agency’s own words.
What the RFI actually says
The framing paragraph sets three goals: focus IT examinations on significant technology-related risks, better account for how institutions manage emerging technology, and “support the ability of institutions to experiment with emerging technologies and tools.” The agency names the risks it has in mind — third-party technology service provider reliance, frontier and agentic super intelligence models, post-quantum cryptography migration, API sprawl, blockchain recordkeeping, faster payments bolted onto legacy cores, and ransomware.
Then it does something useful. It states the standard it intends to apply:
“Under the rule, the FDIC will only issue a Matter Requiring Attention for a practice, act, or failure to act that could reasonably be expected under current or reasonably foreseeable conditions, to materially harm a financial institution’s financial condition or present a material risk of loss to the Deposit Insurance Fund…”
That is the OCC/FDIC final rule at 91 FR 56004 (September 1, 2026), codified at 12 CFR 4.92 and 12 CFR 305.1. Section 305.1(c) confines MRAs to practices that are contrary to generally accepted standards of prudent operation and that carry the materiality element.
Translation for the practitioner: an examiner who wants to write you up for a stale runbook now has to connect the runbook to a plausible loss. Your job is to make that connection either obvious or impossible. Which means the evidence you keep should be built around harm, not around ceremony.
The 25 questions, sorted by what they demand
The questions cluster into eight sections. Here is the same list reorganized into what you would actually have to produce, with the question numbers so you can check the mapping.
| RFI question | What examiners are circling | Artifact that answers it |
|---|---|---|
| Q1, Q5 | Whether your IT risk work connects to financial harm | Risk assessment with quantified exposure ranges and the assumptions behind them |
| Q2, Q3 | Exam scoping and URSIT rating quality | Your last three IT exam scoping memos and how you prepped each component rating |
| Q4 | Recurring exams vs. event-driven reviews | Incident log mapped to the review triggers you would accept |
| Q6, Q7 | Automation and standards-based evidence | Machine-readable control evidence; the maturity model you use and its version |
| Q8, Q9 | Super-intelligence and agentic risk | AI/agent inventory with tool permissions, data reach, and kill-switch test results |
| Q10 | Patch prioritization and compensating controls | Exploit-before-patch decisions, compensating control selection logic, patch SLA exceptions |
| Q11 | Asset inventory accuracy | Reconciliation between CMDB, EDR telemetry, and procurement — with a variance number |
| Q12 | End-of-life software, hardware, and provider features | EOL register with dates, migration owner, and interim control |
| Q13 | Ransomware | Runbooks, RTOs, forensics retainer, backup restore tests, offline copy verification |
| Q14 | Resilience of third-party-dependent operations | Recovery test results covering provider failure, not just own-site failure |
| Q15 | Post-quantum migration readiness | Cryptographic inventory, PQC dependency map, migration dates per system |
| Q16 | MSP and MSSP oversight | Provider control attestations, oversight cadence, and your own escalation test |
| Q17 | Inconsistent provider due-diligence asks | Your standard due-diligence pack and what you waive |
| Q18–Q21 | Controlled experimentation | Pilot charter, data limits, promotion gate, exit criteria |
| Q22–Q24 | Community bank tailoring, staffing, training | Headcount math and the specific tools you deferred on cost |
| Q25 | The open floor | Your own list of procedures that generate work without producing risk information |
Most of these rows are artifacts you can assemble in a week if the program is real. The rows that hurt when they are blank are Q11’s variance number, Q12’s register, and the Q18–Q21 promotion gate — those are the ones where a plausible-sounding answer falls apart under a single follow-up question.
Where the money actually is
Three questions carry a shorter path to a finding than the rest, because each one produces a measurable gap.
Q11, asset inventory accuracy. The FDIC asks how it can “efficiently assess the accuracy and completeness” of your inventory. That means it intends to test accuracy, not read the inventory. The test is trivial: pull DHCP leases or EDR agents, diff against the CMDB. If 140 endpoints have no owner, you have a finding, and you have it before anyone discusses whether it is material.
Q10, compensating controls. The RFI’s exact framing — “how should the FDIC evaluate financial institutions’ compensating controls when exploit activity precedes availability of patches from third-party service providers” — is the agency conceding that patching sometimes waits on someone else. It is also inviting you to document the wait. A compensating control with no stated expiry, no owner, and no micro-verification is a placeholder, and it reads as one.
Q12, end-of-life. Not “we know it’s EOL.” An EOL register with the date, the migration estimate, the interim control, and a named owner who signs quarterly. Institutions running 2019-era virtualization on a host that cannot take the current release have this conversation every exam and lose it because the register does not exist.
Architecture, Infrastructure, and Operations has been the reference for the inventory and capacity work since June 2021, and Development, Acquisition, and Maintenance (August 2024) covers change control for exactly this. If you have never had to defend an exam scope before, the mechanics of how booklet language becomes a request are worth reading once — how examiners turn the IT handbook into document asks. The RFI does not create a new expectation. It tells you which existing ones survived the materiality filter.
Question 19 is the real fork
Four questions sit under “Use of Emerging Technology,” and Question 19 asks how exam procedures should distinguish “proofs of concept, internal pilots, limited production deployments, and full-scale implementation.”
The distinction is a control, not a vocabulary exercise. It exists only if four things exist:
- A pilot register with a start date and an expiry date.
- A data boundary — production customer data, de-identified, or synthetic, with the choice reasoned.
- A promotion gate with named approvers and written criteria.
- A kill switch someone has actually pulled in a test.
Without those, “it’s a pilot” is what you say after the model starts scoring real applicants. Examiners hear it constantly and price it accordingly. If you want the full version of that gate, it is the same logic as a new product risk assessment — pre-launch evaluation across compliance, operational, financial, and reputational lenses, with a sign-off before exposure.
Question 21 is the follow-on and it is unusually generous: the FDIC asks what practices should be the focus of examination for controlled experimentation. That is a live invitation to define the standard you will be measured against.
How to write the comment
The comment window is your only chance to shift the scoping rule before it hardens. Five elements make a comment usable rather than decorative:
- Name the question numbers you are answering.
- One concrete case with numbers — dates, counts, hours, dollars.
- The rule you want, stated as a sentence the agency could paste into guidance.
- What the current practice costs you, quantified.
- The institution segment you are speaking for.
Example paragraph, real structure, hypothetical numbers:
Re Q16. We are a $3.1 billion state nonmember bank with 41 third-party technology providers, four designated critical. In 2025 our exam team requested provider control evidence for two providers already covered by current SOC 2 Type 2 reports with no bridge-letter exceptions; assembling the duplicate pack took 96 staff hours across risk and IT. We recommend examiners accept a current SOC 2 Type 2 plus bridge letter as the baseline artifact for non-critical providers, and reserve independent testing for providers supporting critical operations.
That paragraph gives an examiner a usable rule, a cost, and a scope. Version it, route it through legal, and file it through the FDIC’s Federal Register publications page or [email protected] with the RIN in the subject line. Sign it at the right level — a comment from a named officer of an institution outranks an association form letter in the staff read.
Thirty, sixty, ninety
Days 1–30. Diff the CMDB against EDR and DHCP and publish the variance internally, ugly number included. Stand up the EOL register. Read the four FFIEC booklets the RFI cites — Information Security, Architecture/Infrastructure/Operations, Business Continuity Management, Development/Acquisition/Maintenance — and map each to your last exam’s requests so you can see which ones you already answer badly.
Days 31–60. File the comment. Then write the pilot standard, because Question 19 says the agency wants one and your product team will otherwise keep calling everything a pilot. Pick one compensating control and rebuild it with an owner, an expiry, and micro-verification.
Days 61–90. Run a provider-failure recovery test, not a site-failure test (Q14) — the failure mode where the vendor is down and your own building is fine is the one most test plans skip, and it is the scenario FFIEC keeps writing about. Add the AI and agent inventory with tool permissions and data reach (Q8). Tabletop the kill switch and record who actually executed it.
So What?
The IT exam has been the easiest exam to game with binders and the hardest to pass with substance. The materiality rule is the FDIC admitting it, and this RFI is the agency asking the industry how to rebuild the program. Institutions that answer with concrete mechanisms will get an exam built around mechanisms. Institutions that answer with “burden” will get the same binder check with a new cover sheet.
The strategic move is not the comment letter. It is that the 25 questions are the cheapest gap assessment you will get for free this cycle, including the ones where your answer is embarrassing. Q11’s variance number and Q12’s blank register are better found by you in December than by an examiner in March.
If your emerging-technology intake is the weak spot — and for most institutions it is — start with the pre-launch gate itself rather than the policy wrapper. The New Product Risk Assessment template gives you the scoring and sign-off structure for pilots, product launches, and vendor integrations, in the shape an examiner will read.
FAQ
Does the RFI change an examination requirement right now? No. The FFIEC IT Examination Handbook, InTREx procedures, and URSIT ratings all still apply. What changes is emphasis: the FDIC has said out loud that it wants material-risk focus and controlled experimentation, and the questions show what evidence it will look for.
Who should own the response? The same person who owns the IT exam relationship, with the CRO or CISO signing. Risk owns the cost figures, IT owns the technical accuracy, legal reviews the recommendations. Do not let the comment become a marketing document — the staff reading it can tell.
What if we have no findings to point at? Then point at time. Staff hours spent on duplicate due-diligence packs, months of delay on a tool the institution wanted, the price of a control it deferred. Cost and delay are the evidence base for tailoring, and the agency asked for exactly that in Questions 20 through 22.
◆ Need the working template?
Start with the source guide.
These answer-first guides summarize the required fields, evidence, and implementation steps behind the templates practitioners search for.
◆ Related template
New Product Risk Assessment
Structured risk review process for new products, services, and business initiatives.
◆ Immaterial Findings · Weekly
Sharp risk & compliance insights. No fluff.
◆ FAQ
Frequently asked questions.
What is the FDIC's November 2026 IT examination RFI?
Does the RFI change any examination requirement right now?
How does the September 2026 materiality rule affect IT exams?
Should a community bank bother commenting?
Author
Rebecca Leung
Rebecca Leung has 8+ years of risk and compliance experience across first and second line roles at commercial banks, asset managers, and fintechs. Former management consultant advising financial institutions on risk strategy. Founder of RiskTemplates.
◆ Related framework
New Product Risk Assessment
Structured risk review process for new products, services, and business initiatives.
◆ Keep reading
Related posts.
Operational Risk
The FDIC Will Let You De-Broker Custodial Deposits. Check the Fee Line in Your Custodial Contract First.
The FDIC's qualifying custodial deposit rule caps the exception at 20% of liabilities and needs an annual certified notice. The fee test decides who qualifies.
Nov 27, 2026
Operational Risk
The Q3 Bank Numbers Look Fine. Two Lines in Chart 9 Don't.
FDIC's Q3 2026 Quarterly Banking Profile shows stable asset quality at 1.28% ROA. Credit card and multifamily past-due rates rose anyway. Build the reconciliation.
Nov 25, 2026
Operational Risk
The OCC Just Called AI Infrastructure Lending a Concentration Risk. Check Your CRE Screen.
The Fall 2026 SARP flags opaque AI infrastructure lending and obsolescence risk. Here's how data center loans land in your CRE concentration screen.
Nov 23, 2026